New Delhi, Dec. 1 -- The water supply will be suspended in certain parts of Gurugram between 3 December and 5 December, owing to essential maintenance work at the Chandu Budhera water treatment plant (WTP) and the connection of a new 1,600 mm water pipeline at the Sector 51 pumping station. The Gurugram Metropolitan Development Authority (GMDA) announced the planned works on Friday, as reported by Hindustan Times.

This 48-hour disruption will commence at 11 AM on 3 December and conclude at 11 AM on 5 December. The areas impacted are Sector 37, all sectors from 42 to 74, and the villages of Badshahpur and Khandsa.

"The work includes connection of the 1,600 mm pipeline for the boosting station in Sector 51 and repair of the existing pipel...