India, Jan. 29 -- The Union Ministry of Environment, Forest and Climate Change (MoEF&CC) has approved the proposal for rebuilding the Teesta-III dam, despite concerns over its design and stability. The new structure will be a 118.64-metre-tall concrete gravity dam.
The original 1,200 MW Teesta-III Chungthang hydroelectric dam was destroyed in a flash flood on October 3-4, 2023. The flood, triggered by a Glacial Lake Outburst Flood (GLOF) from the South Lhonak Lake, washed away the 60-metre-tall concrete dam, claiming 40 lives.
The project is located on the main Teesta River in Mangan district, utilising a drop of approximately 800 metres between Chungthang and Sankalang villages.
In a meeting held on January 10, 2025 the environment mi...
Click here to read full article from source
To read the full article or to get the complete feed from this publication, please
Contact Us.