United Arab Emirates, May 22 -- Wood, a global leader in consulting and engineering, has been awarded a contract to deliver the detailed engineering design for 'Package 5' of ADNOC Offshore's Lower Zakum Long-Term Development Phase 1 (LTDP1) project, located on Das Island in the United Arab Emirates (UAE). The contract was secured from Target Engineering Construction Company (Target Engineering), the appointed Engineering, Procurement and Construction (EPC) contractor for this phase of the project.Located around 65 kilometres northwest of Abu Dhabi in the central Arabian Gulf, Lower Zakum Field is one of ADNOC's strategically significant offshore assets.The LTDP1 project aims to expand and sustain production capacity of 450 thousand barrels...