India, April 25 -- Bharat Petroleum Corporation announced that Hon'ble Prime Minister, Narendra Modi, laid the foundation stone of a state-of-the-art LPG Bottling Plant with a Rail Unloading Facility at Hathua in Gopalganj District, Bihar.The project, worth Rs 340.15 Crore, is scheduled to be completed by 31 March 2027. The new LPG Bottling Plant will have a capacity of 180 Thousand Metric Tons Per Annum (TMTPA). The plant will be equipped with state-of-the-art infrastructure, including a railway unloading siding for efficient LPG receipt and storage, Mounded Storage Vessels (MSV) for safe storage, and a 2x24 station electronic carousel for streamlined operations.This project will meet the enhancing demand of LPG in North-West Bihar and Nor...