Germany, Sept. 24 -- The Nordex Group has received its first order from Spain for the supply of N175/6.X wind turbines. The independent power producer (IPP) Abei Energy, based in Madrid, has ordered eight turbines for the Avellanosa wind farm, located northwest of Burgos in the Castile and Leon region of Spain.In addition, Abei Energy has opted for the Nordex Group's Premium Service for maintenance of the turbines with a 20-year term. This ensures the power producer long-term operational reliability and maximum energy yields.The N175 turbines will be delivered and installed by the Nordex Group on tubular steel towers with a hub height of 119 meters. The installation of the turbines is scheduled to begin in late summer 2026, with commissioni...