Italy, Sept. 12 -- MAIRE announces that NEXTCHEM, through its subsidiary MyRechemical, key player in the Waste-to-Chemical segment, has been awarded an engineering study contract by Altalto Ltd. based on its proprietary NX CircularTM gasification and NX CPOTM technologies for a SAF plant in Immingham, Lincolnshire, United Kingdom.Altalto (Immingham) Ltd. is a company set up by Velocys to develop SAF projects in the UK. The plant is expected to be operational in 2030. Initial targets include the production of 30 million litres (23 thousand tonnes) of SAF per year for the UK market in support of the SAF Mandate[1]. Feedstocks will be sourced from residual municipal solid waste (MSW) and commercial and industrial (C&I) waste.The project has be...