Norway, Aug. 13 -- Successful completion of the third step in the qualification process at METHA has advanced MVW to the fourth and final step, as announced on July 14th, 2025. METHA is one of the leading facilities in the dredging industry, recognized for both its size and role in sustainable dredging management.The planned paid long-term trial (minimum one month duration) is scheduled to start in Q4 2025. MVW will supply its natural NORWAFLOC(R) products for the dewatering of approximately 10,000 m[3] of pre-thickened dredging sludge per month. This volume represents more than 1/3 of the current average volumes treated at METHA. The trial will be conducted using one of the plant's two identical chamber filter presses. Based on previous su...