Norway, Sept. 10 -- Today, the operator of the Balder field Var Energi ASA, has announced that Jotun FPSO has reached peak production ahead of schedule.The Jotun FPSO was brought onstream on 22 June 2025. All 14 subsea production wells are now online and producing in line with expectations.Production from the Jotun FPSO is now over 80,000 barrels of oil equivalent per day (boepd), adding to the approximately 30,000 boepd from the Balder FPU and Ringhorne facilities. This brings the total output for the Balder Area to more than 110,000 boepd (gross), with Kistos holding a 10% stake in the license. Balder Phase V is ongoing. Six new multi-branch subsea production wells are underway, with expected production rates and reserves equivalent to th...