Italy, Aug. 1 -- Eni announces the start of production from the Agogo Integrated West Hub (Agogo IWH) development project, operated by Azule Energy in block 15/06 in the lower Congo Basin, offshore Angola.Agogo IWH involves the full field development phase of two fields, Agogo and Ndungu, with combined reserves of approximately 450 million barrels and an expected peak production of approximately 180 Kbopd. The beginning of production was achieved thanks to the successful start-up of the Agogo FPSO, which takes place after only 29 months from FID, significantly ahead of plan and around 12 months faster than industry average for deepwater projects of similar scale, whilst maintaining constant focus on safety.The development of Agogo and Ndung...