Egypt, June 4 -- ABB has won an order from Al Ezz Dekheila Steel Co. (EZDK) to enhance the critical operations of three main central water treatment plants located at the Ezz Steel plant in Alexandria, Egypt. The site is a fully integrated steelmaking facility and incorporates three direct reduction plants for producing high-quality Direct Reduced Iron (DRI), with an annual production capacity of 3.1 million tons. EZDK is the leading steel importer and distributor in Egypt and, since it was established in 1985, has grown to become the largest independent steel producer in the Middle East and North Africa.ABB will provide ABB Ability (TM) System 800xA(R) distributed control system (DCS) to support improvements across eight key operational ar...