India, July 8 -- Sixty four slum residents from Shankar Lane, Malad, received keys to their new homes in Slum Rehabilitation Authority's (SRA) permanent transit camp (PTC) in Sairaj Guriyapada building, located at a 10-minute drive from their original addresses, on Monday, to pave the way for the first two phases of the extension of Shankar Lane to the Gautam Buddh Marg, leading to the New Link Road. This stretch measures 150 meters.
It is for the first time that project affected people (PAPs) have been relocated in PTC homes, given the shortage of space for their relocation. In February, the first lot of 110 residents were relocated to PTC homes in the same building.
The idea for this mode of transfer was conceived in August 2024 throu...
Click here to read full article from source
To read the full article or to get the complete feed from this publication, please
Contact Us.