India, Aug. 12 -- The National Green Tribunal (NGT) has dismissed a petition challenging construction of the Tirupati Balaji temple at Ulwe in Navi Mumbai after the Tirumala Tirupati Devasthanams (TTD), the project proponent, assured the tribunal via a sworn affidavit that no construction activity would be carried out in areas falling within the Coastal Regulation Zone (CRZ).
The proposed temple, modeled after the Tirumala shrine in Andhra Pradesh, will be built at a cost of Rs.70 crore, on a 40,000 square metre plot allotted by the City and Industrial Development Corporation (CIDCO) to TTD in April 2022. The plot is located near the Mumbai Trans Harbour Link (MTHL) and the upcoming Navi Mumbai International Airport.
The groundbreaking ...
Click here to read full article from source
To read the full article or to get the complete feed from this publication, please
Contact Us.