India, April 5 -- An underpass beneath the Hero Honda Chowk flyover, which became operational in May 2018 is now under the scanner of the Central Road Research Institute (CRRI), which is conducting the structural audit of the flyover. A member of the investigating team from CRRI said that cracks have been observed in the underpass during the visual inspection and they will conduct further testing of the structure to check its integrity. Last month, the CRRI had started a structural audit of the Hero Honda Chowk flyover, after the bridge was damaged for the fourth time since it became operational.

The underpass at Hero Honda Chowk was constructed from 2014 to 2018 and it is 681.85 metres in length and 22.5 metres wide. The underpass has t...