Gurugram, Sept. 2 -- The Gurugram Metropolitan Development Authority (GMDA) has intensified measures to tackle waterlogging across the city, with its flood control office operating round-the-clock since July to safeguard residents and keep traffic moving during the monsoon season, officials said.

High-capacity pumping systems have been installed at waterlogging-prone points, including Narsinghpur, Khandsa Chowk, Basai Chowk, Rajiv Chowk, and the stretch near Tau Devi Lal Stadium. These pumps drain stormwater during heavy rains, while mobile tractor-mounted pump sets and suction tankers are on standby for deployment across the city depending on real-time conditions.

"Flexible pumping systems allow us to provide immediate drainage support...