Gurugram, Sept. 2 -- The Gurugram Metropolitan Development Authority (GMDA) has intensified measures to tackle waterlogging across the city, with its flood control office operating round-the-clock since July to safeguard residents and keep traffic moving during the monsoon season, officials said.
High-capacity pumping systems have been installed at waterlogging-prone points, including Narsinghpur, Khandsa Chowk, Basai Chowk, Rajiv Chowk, and the stretch near Tau Devi Lal Stadium. These pumps drain stormwater during heavy rains, while mobile tractor-mounted pump sets and suction tankers are on standby for deployment across the city depending on real-time conditions.
"Flexible pumping systems allow us to provide immediate drainage support...
Click here to read full article from source
To read the full article or to get the complete feed from this publication, please
Contact Us.