India, Sept. 17 -- The National Capital Region Transport Corporation (NCRTC) has completed the geo-technical survey for the proposed Regional Rapid Transit System (RRTS) corridor connecting Gurugram and Greater Noida via Faridabad and Noida, which will also link with the Ghaziabad-Jewar airport corridor, a senior NCRTC official aware of the matter said.

According to the official, the proposed line will run for 60 kilometres and connect four key NCR cities. "The geo-technical survey of the proposed RRTS alignment has been carried out. The length of the line will be 60 kilometres and it will connect Gurugram, Faridabad, Noida and Greater Noida," the official said, adding that while six stations had initially been proposed, the number is "l...