Hanoi, May 28 -- Deputy Prime Minister Le Thanh Long signed Decision No. 1012/QD-TTg on May 26, approving a project on training human resources for nuclear power development by 2035. The objective of this project is to meet the human resources demand of the Ninh Thuan 1 and Ninh Thuan 2 nuclear power plants by 2030. Specifically, the total workforce required for Ninh Thuan 1 is approximately 1,920 people, including 1,020 with university degrees and 900 with college-level qualifications. Of the university-level workforce, 320 individuals will be newly trained abroad. For Ninh Thuan 2, the total personnel needed is around 1,980 people, including 1,050 with university and postgraduate degrees and 930 with college-level qualifications. Among ...