WASHINGTON, Sept. 16 -- Southeastern Power Administration has issued a notice called: Notice of Interim Approval of Rate Schedules for Cumberland System of Projects.

The notice was published in the Federal Register on Sept. 16 by Treena V. Garrett, Federal Register Liaison Officer, U.S. Department of Energy.

Summary: The Administrator for the Southeastern Power Administration (Southeastern) has confirmed and approved, on an interim basis, rate schedules CBR-1-K, CSI-1-K, CEK-1-K, CM-1-K, CC-1-L, CK-1-K, CTV-1-K, CTVI-1-D, and Replacement-3. These rate schedules are applicable to Southeastern power sold to existing preference customers in Alabama, Georgia, Illinois, Kentucky, Mississippi, North Carolina, Tennessee, and Virginia. The rate s...