WASHINGTON, Oct. 1 -- Nuclear Regulatory Commission has issued a notice called: NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Units 1 and 2; Subsequent License Renewal and Record of Decision.

The notice was published in the Federal Register on Oct. 1 by Michele Sampson, Director, Division of New and Renewed Licenses, Office of Nuclear Reactor Regulation.

Summary: The U.S. Nuclear Regulatory Commission (NRC) has issued Subsequent Renewed Facility Operating License Nos. DPR-24 and DPR-27 to NextEra Energy Point Beach, LLC (NextEra or the licensee) for Point Beach Nuclear Plant (Point Beach), Units 1 and 2, respectively. In addition, the NRC has prepared a record of decision (ROD) that supports the NRC's decision to issue Subse...