RALEIGH, N.C., Nov. 11 -- Onslow Water & Sewer Authority has issued a solicitation notice (806ONW2502) on Nov. 6 for Holly Ridge Effluent Force Main Modification Project.
Bids Open Date: Thu Dec 04 13:00:00 IST 2025
Description: Relocation Of Approximately 300 Linear Feet Of Existing 8-inch Effluent Force Main To Avoid Conflicts With Future Duke Energy Transmission Infrastructure Construction. The Project Is Located Within The Duke Energy Folkstone Transmission Main Corridor, Located Near The Terminus Of Hines Stump House Church Road In Holly Ridge, Nc.
Status: Open
Disclaimer: Curated by HT Syndication....