GENEVA, June 3 -- LG ENERGY SOLUTION, LTD. (Tower1, 108 Yeoui-daero,Yeongdeungpo-gu,Seoul 07335), 주식회사 엘지에너지솔루션 (서울특별시영등포구여의대로 108, 타워1) filed a patent application (PCT/KR2024/017431) for "METHOD FOR MANUFACTURING ELECTRODE ASSEMBLY, BATTERY CELL MANUFACTURED USING SAME, AND SYSTEM FOR MANUFACTURING ELECTRODE ASSEMBLY" on Nov 06, 2024. With publication no. WO/2025/110573, the details related to the patent application was published on May 30, 2025.
Notably, the patent application was submitted under the International Patent Classification (IPC) system, wh...