WASHINGTON, April 28 -- Federal Energy Regulatory Commission has issued a rule called: Building for the Future Through Electric Regional Transmission Planning and Cost Allocation.
The rule was published in the Federal Register on April 28 by Carlos D. Clay, Deputy Secretary.
Summary: In this order, the Federal Energy Regulatory Commission addresses arguments raised on rehearing, grants clarification, in part, and denies clarification, in part, of Order No. 1920-A, which addressed arguments raised on rehearing of, set aside, in part, and clarified Order No. 1920. Order No. 1920 required transmission providers, inter alia, to conduct Long-Term Regional Transmission Planning to ensure the identification, evaluation, and selection, as well as...