WASHINGTON, May 25 -- ARGONNE NATL LAB - DOE CONTRACTOR, ENERGY, DEPARTMENT OF, has a requirement for "Estimating the Cost of a Manufacturing Plant for LFP-Based Lithium-Ion Cells". The solicitation notice (5-B191-P-00160-00) was posted on Apr 29, 2025 03:12 pm CDT. All responses are due by May 12, 2025 05:00 pm CDT.

Contract Notice Type: Solicitation (Updated)

Description: The objective of this requirement for a study is to estimate the design and cost of setting up and operating a large- scale plant in the United States to produce LIB using LFP and LFMP cathode active materials. Estimates for three plant sizes should be provided for 5, 25, and 50 GWh per year capacity plants.This work is expected to provide Argonne with a design of the ...