Bengaluru, June 3 -- Land acquisition in Tamil Nadu and Andhra Pradesh nearing completion: NHSRCL Managing Director

In a significant push to enhance connectivity from Mysuru to Chennai, the Central Government has accelerated the Mysuru-Bengaluru-Chennai bullet train project.

The ambitious high-speed rail corridor, spanning approximately 435 kilometres, aims to drastically reduce travel time between the three major cities.

The project, led by the National High Speed Rail Corporation Limited (NHSRCL), will feature a dedicated bullet train track designed for speeds up to 350 km per hour. Once operational, the train is expected to cut the current travel time of 6 hours and 30 minutes to just 2 hours and 25 minutes between Mysuru and Chenna...