Hyderabad, May 31 -- The major projects in the Krishna basin have started receiving good inflows owing to the low-pressure area built up in the Arabian Sea, and Karnataka is receiving torrential rains.

As per the information shared by the irrigation department as of 6 am on May 31, the Priyadarshini Jurala Project (PJP) located on the border of Jogulamba-Gadwal and Wanaparthy districts, has seen average inflows of 60,337 cusecs in 24 hours.

The gates of the project have been lifted to release 54,307 cusecs of water, with 30,702 cusecs released through the spillway, 22,626 cusecs of water released for power generation, and 934 cusecs into the left and right canals of the project.

The present water level at the Jurala project is 1,042.72...