Hyderabad, June 24 -- It seems the troubles of the Bahadurpura residents are not likely to be ending soon. Their troubles are growing day by day even after the construction of a new bridge. The residents were hoping that the traffic jams in the area would be decreased. New problems were created for the residents of the area due to the heavy downpour as the rainwater with slaughterhouse waste entering into their shops. This situation is likely to persist till next three months.

After the construction of the bridge, the water authority have excavated the ground for laying the water pipelines which is creating an innumerable problem for the traffickers. Instead of finishing the water lines project with day and night work the project has bee...