New Delhi, May 28 -- Development of 4-Lane #Badvel- #Nellore Highway from Badvel- Gopavaram Village on National Highway NH-67 to Guruvindapudi on NH-16 in Andhra Pradesh

The Project will be on Design-Build-Finance-Operate-Transfer (DBFOT) mode

New Delhi, May 28The Cabinet Committee on Economic Affairs chaired by the Prime Minister Narendra Modi has approved the construction of 4-Lane Badvel-Nellore Corridor with a length of 108.134 km at a cost of Rs.3653.10 crore in state of Andhra Pradesh on NH(67) on Design-Build-Finance-Operate-Transfer (DBFOT) Mode.

The approved Badvel-Nellore corridor will provide connectivity to important nodes in the three Industrial Corridors of Andhra Pradesh, i.e., Kopparthy Node on the #Vishakhapatnam-#Che...