MANILA, Nov. 25 -- Transmission facilities in the Visayas affected by Tropical Depression Verbena have been fully restored, the National Grid Corporation of the Philippines (NGCP) said Tuesday.

In its 5 p.m. advisory, the NGCP said the situation normalized after the restoration of the Paranas-Quinapondan 69kV line at 12:01 p.m. It serves the Eastern Samar Electric Cooperative Inc. (ESAMELCO).

The NGCP earlier announced the restoration of the Ubay-Garcia 69 kilovolt (kV) line, which services the Bohol II Electric Cooperative, Inc. (BOHECO II); the Iloilo-Lapaz 69kV Line, which serves the MORE Electric and Power Corp. and the Iloilo 1 Electric Cooperative, Inc. (ILECO I); and the Sta. Barbara-Miagao-San Joaquin 69kV Line.

"NGCP assures t...