Bhubaneswar, May 19 -- https://images.odishatv.in/uploadimage/library/16_9/16_9_0/recent_photo_1747667294.webp

The Elevated Road Corridor project in Bhubaneswar has encountered delays, and structural changes are very likely to be incorporated in it due to the metro rail project in the Capital City, Works Minister Prithiviraj Harichandan informed on Monday.

Initially scheduled to start in May, the project aims connect Jayadev Vihar to Nandankanan. Although the tendering process was completed, the need for structural modifications to accommodate a future metro train line has necessitated a redesign.

Except for redesigning the elevated road corridor project, the basic concept remains untouched. Consequently, the prior tender has been cancel...