KUALA LUMPUR, Sept. 23 -- Train services on the MRT Putrajaya Line are experiencing significant delays following a power supply disruption between Taman Equine and 16 Sierra Station.

As a result of the technical fault, Rapid KL said it has implemented alternative transportation arrangements to minimise passenger inconvenience during the service interruption.

Trains originating from Kwasa Damansara will now terminate at UPM station and turn back, rather than continuing their normal route to Putrajaya Sentral.

The transport operator has deployed shuttle trains operating between Taman Equine and UPM stations using Platform 1 to maintain partial connectivity along the affected route.

Additionally, shuttle bus services have been arranged t...