SRINAGAR, Aug. 28 -- The Chief Engineer, JKPTCL Kashmir, and the Chief Engineer, Distribution KPDCL, have issued separate shutdown schedules to carry out various works on transmission and distribution lines, which will affect power supply in several areas of Kashmir on August 31 and September 1, 2025.
On 31 August 2025, a shutdown will be observed at multiple locations:
Bandipora Region: To replace buckled bottom cross arm and tower leg at location No. 52 (D+6) of Circuit-I, shutdown of 33 KV Bandipora, Aloosa, Nadihal, and Gurez lines will be observed from 08:00 AM to 03:00 PM, affecting 33/11KV Receiving Stations at Aloosa, Ajar, Nusoo, Naidhal, Panzigam, Ajas, Dawar and Gurez. Power supply to Aloosa, Quail, Malangam, Nusoo, Naidhal, Aj...