India, July 23 -- The Government of India issued the following news release:

The specific measures outlined to reach this goal involve a multi-faceted approach, leveraging both indigenous development and international collaboration. Key strategies include the continued deployment of Indigenous Pressurized Heavy Water Reactors (PHWRs), building upon the 24 reactors with 8780 MW capacity. There are also 8 reactors under construction contributing 6600 MW, which include indigenous 700 MW PHWRs like RAPP 8 and GHAVP 1&2, alongside the Indigenous Fast Breeder Reactor (FBR) PFBR, and Light Water Reactors (LWRs) with foreign cooperation such as KKNPP 3&4 and KKNPP 5&6. Furthermore, 10 reactors are at the pre-project activities stage (sanctioned), ...