India, July 28 -- WORLD BANK (WB) has issued a tender notice titled "Legal Consultant for Dhar 3 Solar Park" with the tender reference no.: 0002017546.
The tender details are as follows: The Dhar 3 Solar Park Project (Project), proposed as a solar-plus-storage project by Rewa Ultra Mega Solar Limited (RUMSL), will be developed on government land in Dhar District, Madhya Pradesh will integrate solar power generation with energy storage solutions to ensure reliable supply of ~100 MW during 7 hours of evening peak and 3 hours of morning peak periods. The Project will be connected to State Transmission Utility or the state grid. The park will consist of multiple units combining solar panels with co-located battery energy storage systems (BESS)...