Noida, Feb. 26 -- The Noida Metro Rail Corporation (NMRC) has issued a request for proposal (RFP) to finalise a contractor for conducting a geotechnical survey along the proposed Metro corridor from Botanical Garden to Sector 142. The survey is crucial in assessing infrastructure, utilities, and soil conditions along the 11.6-km stretch before construction begins, officials said on Tuesday,...