Sandhurst Rd: Power cuts and noisy nights
India, March 5 -- On Nowroji Hill Road No 5, just outside Sandhurst Road railway station, the road extends 200 metres - excavation began three months ago and the surface is yet to be levelled and concretised.
A resident of Tej Kiran building said electricity lines were damaged, leading to a two-day outage. Santosh Sarole, 53, another resident, said late-night work till 4am is casing sleepless nights. "We get sleep only after the work halts, in the early hours. As a result, I end up getting to my metal workshop at 1pm instead of the usual 8.30am."
"This is not a very long stretch but we feel cut off. All our complaints have fallen on deaf ears. Even just walking on the road is hazardous," says Arun Chauhan, 40, a businessman and resident.
Kamalakar Shenoy, an activist from B ward, claims roads at 12 locations in the ward have been excavated on both sides.
A senior civic official said stoppages can occur due to substandard work by contractors, political intervention or unforeseen utility issues. "The delay is not always in our hands," he said....
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.