Low water flow in k-ward due to Metro-7A work
Mumbai, June 21 -- As part of the Mumbai Metro-7A project, the Mumbai Metropolitan Region Development Authority (MMRDA) will be carrying out tunnelling work under the 1800-mm diameter water main near Veravali Reservoir in Andheri (East) in the K-East Ward.
The work will be carried out from June 22 to June 28, from 7:30 am to 3:30 pm and from 9:30 pm to 3:30 am. Due to this, there will be low water pressure. In Vile Parle (East), low water pressure is scheduled from 5 pm to 8 pm during the said days. Old Nagardas Road, New Nagardas Road, Mogarapada, Andheri-Kurla Road will have low water pressure from 8 pm to 9:30 pm.
The authorities have requested citizens in the affected areas to take necessary precautions by storing adequate water in advance....
To read the full article or to get the complete feed from this publication, please
Contact Us.