MUMBAI, April 17 -- The Central Railway (CR) plans to reclaim a 300-500-metre encroached stretch connecting Lokmanya Tilak Terminus (LTT) with Vidyavihar railway station on the Main Line. This would improve road access to LTT, which is currently accessed via Tilak Nagar on the Harbour Line....