Kullu-Manali NH: Traffic plan chalked out
Shimla, Sept. 24 -- As part of the traffic restoration on the Kullu-Manali national highway, district magistrate Torul S Raveesh has issued orders for a traffic plan after several sections of the NH were washed away by swollen Beas River after the monsoon fury.
The Raison-Manali (Right Bank Road) will be closed from 10 am to 2 pm and from 5 pm to 9.30 pm. During this period, all traffic between Kullu and Manali will be diverted via the Left Bank Road (via Raison).
From 2 pm to 5 pm, the Right Bank Road will be open only for one-way traffic from Kullu to Manali. During this time, only local vehicles will be allowed to travel in both directions between Patlikuhl and Kalath. The journey from Raison to Aloo Ground takes 50 minutes. Therefore, the NH will be closed to all vehicles at Raison from 4.30 pm and from Aloo Ground from 5.20 pm.
The NH will be completely closed from 5 pm to 9.30 pm for repair and widening work. During this time, only emergency vehicles will be allowed and the remaining traffic will travel via the Left Bank Road.
One-way traffic will be restored on the NH from 9.30 pm to 10 am.htc...
To read the full article or to get the complete feed from this publication, please
Contact Us.