India, Sept. 26 -- The National Highways Authority of India has allowed partial resumption of work on the Sohna road project from Saturday. The work was stopped after the collapse of a concrete slab of an elevated corridor of the project on August 22. NHAI officials said that work would be allowed to start at surface level and not on the elevated structure, which will be resumed only after getting the report of high-level technical committee probing the collapse....