Gurugram, Oct. 18 -- Despite facing backlash from citizens on the proposed construction of a road via Aravalli Biodiversity Park, Gurugram Metropolitan Development Authority (GMDA) on Saturday confirmed that the plan for the road has been retained in the final draft of the Comprehensive Mobility Plan (CMP).

The draft of the CMP is awaiting approval from by the GMDA's Resident Advisory Council (RAC) and later by chief minister ML Khattar.

The CMP has been compiled by the School of Planning and Architecture (SPA), New Delhi, to improve public transport and pedestrian infrastructure in Gurugram. A six-month-long extensive study of traffic infrastructure, road network, parking facilities among others was conducted to prepare the CMP.

In 2019...