Goa, March 26 -- The New Mandovi Bridge will remain closed for all vehicular traffic from March 27th to April 5th for maintenance work. During this period, vehicles with a weight of up to 12 tons will be diverted to the Old Mandovi Bridge. Meanwhile, vehicles with a Gross Vehicle Weight (GVW) exceeding 12 tons will be redirected to the Atal Setu Bridge.

This traffic diversion is being implemented to ensure safety and smooth flow of traffic while necessary maintenance is carried out on the New Mandovi Bridge. Motorists are advised to plan their routes accordingly and follow all traffic signs and directions to avoid inconvenience. Authorities have urged the public to cooperate and be cautious while driving through the diverted routes.

Pub...