Goa, Oct. 11 -- Repair work on the Borim Bridge is set to begin, with phased closures planned from October 11 to November 2, 2025. Authorities have outlined specific timings to minimize disruption while ensuring the safety of commuters.
The bridge will be closed during the following periods:
During the repair work, heavy vehicles will be prohibited from using the bridge. Motorists are advised to plan alternative routes and follow traffic advisories to avoid inconvenience.
The phased schedule aims to facilitate smooth repair operations while maintaining limited access for essential traffic.
Published by HT Digital Content Services with permission from Herald Goa....
		
			Click here to read full article from source
			
			To read the full article or to get the complete feed from this publication, please 
Contact Us.