Dehradun, Sept. 6 -- During the inspection, Chief Secretary Om Prakash directed the executive agencies involved in the reconstruction work to expedite the work and ensure high quality work. He said that the reconstruction work ought to be completed within the prescribed time limit. The boundary wall and the mandal wall are under construction currently around the Adi Shankaracharya Samadhi. The boundary wall's proposed height is 12 metres and of the mandal wall 3 metres. A 48 meter linga and 3.6 meter wide passage is also being constructed from Divyashila to Samadhi, on the raft has been laid but it is now being concreted. In this regard, the Chief Secretary directed Vikas Rana, the manager of Jindal Social Works to complete the work related...