India, Feb. 10 -- KPI Green Energy Limited has informed that, pursuant to Regulation 30 of the SEBI (LODR) Regulations, 2015, it has received Service Orders and a Purchase Order from Adani Green Energy Limited and Adani Green Energy Six Limited for the execution of works related to a 300 MWac / 405 MWdc project at the Khavda Hybrid Renewable Power Project, located in the Renewable Energy Park at Khavda, Kutch, Gujarat.

The scope of work includes execution of electrical AC–DC works and civil works, such as pile foundations, installation of stubs, erection of module mounting structures, installation of modules, robotic cleaning system structures, and IDT stations. It also involves the supply of electrical DC/AC and HT equipment, exclud...