Mumbai, Feb. 19 -- The project, part of the Bengaluru Suburban Rail Project (BSRP), involves the development of Package C4A, which includes the construction of nine stations along Corridor-4A. These stations comprise one elevated station and eight at-grade stations at locations such as Heelalige, Singena Agrahara, Huskur, Ambedkar Nagar, Carmelaram, Bellandur, Marathahalli, Doddanakundi, and Kaggadasapura.

The scope of work also includes civil and structural works, entry/exit structures, steel foot-over-bridges (FOB), roof structures, pre-engineered buildings (PEB), architectural finishes, electrical and mechanical works, as well as detailed design and engineering (DOC).

The total value of the contract is Rs 554.46 crore, with the proje...