Mumbai, March 7 -- The LoA includes carrying out final location survey, which involves preparing the detailed project report (DPR), final alignment design, traffic survey report, rate of return (ROR) calculations, detailed estimates, and the preparation of EPC documents for the High-Speed Elevated Rail Corridor between Hyderabad-Bengaluru and Hyderabad-Chennai, using modern survey techniques such as Airborne and Terrestrial LIDAR.
The value of the order is Rs 27.96 crore, and it is scheduled to be completed within eight months.
The official announcement was made on Thursday, 06 March 2025, after market hours.
RITES, a Miniratna (Category-I) Schedule 'A' public sector enterprise, is a leading player in the transport consultancy and engi...
Click here to read full article from source
To read the full article or to get the complete feed from this publication, please
Contact Us.