Mumbai, July 9 -- The first order, valued at Rs 9.03 crore bagged from the modern coach factory (MCF), Lalganj, Raebareli, a unit of Indian Railways. The order entails the manufacturing and supply of 90 sets of seats and berths for LWSCN coaches and 40 sets of seats for LHB GS coaches.

The delivery of this order is to be made to the furnishing depot of modern coach factory (MCF). As per the contract, 100% payment will be made upon receipt, inspection, and acceptance of the material by the consignee at the destination.

The execution timeline for the first order includes delivery of 90 sets by 13 July 2026, while the 40 sets are scheduled for delivery by 11 May 2026.

The second order, worth Rs 2.45 crore received from integral coach fact...