Mumbai, July 1 -- The order includes 15 sets of main boiler feed pumps, booster pumps, motors, and accessories for the Gadarwara STPP Stage-II (2x800 MW) and Nabinagar STPP Stage-II (3x800 MW). Deliveries are scheduled over 20-28 months, with payments linked to project milestones.

KSB manufactures a range of standard industrial end suction and high-pressure multistage pumps, submersible motor pumps, monoblock pumps and other value-added parts for the agricultural, wastewater treatment, energy (nuclear and conventional power), and oil and gas sectors, as well as other industries.

Larsen & Toubro (L&T) is an Indian multinational engaged in EPC projects, hi-tech manufacturing, and services.

Shares of Larsen & Toubro shed 0.48% to Rs 3,651...