Mumbai, Dec. 19 -- The scope of the work order encompasses the removal of rock pinnacles and high spots at the Coastal Berth of Jawaharlal Nehru Port, followed by the disposal of the dredged material at the designated dumping ground, DS-3.
This technically critical rock dredging assignment necessitates extensive pre-treatment and the execution of underwater controlled blasting, subsequent to high-precision drilling operations in rock formations exhibiting compressive strengths in excess of 170 megapascals.
The operations will be carried out through an integrated deployment of advanced marine assets, including a dedicated drilling and blasting barge, trailing suction hopper dredgers (TSHDs), a backhoe dredger, self-propelled hopper barge...
Click here to read full article from source
To read the full article or to get the complete feed from this publication, please
Contact Us.