Mumbai, Sept. 9 -- The order entails the engineering, design, manufacture, and supply of advanced tunnel furnaces for JSW JFE's facility in Nashik. These tunnel furnaces are a critical component in the production of CRGO steel, which is used extensively in high-efficiency power transformers and other energy transmission applications.

As part of the contract, John Cockerill India will also supervise the erection and commissioning of the furnaces to meet contractual performance guarantees. The project is scheduled for completion in the first quarter of 2027.

The scope of supply includes all components for the tunnel furnace systems, including advanced coil handling systems, with a focus on seamless integration and optimal operational perf...