Mumbai, Aug. 18 -- The tender for the project was issued by the Rajasthan Water Grid Corporation, previously known as the Eastern Rajasthan Canal Project Corporation.

The contract, awarded on a Hybrid Annuity Model (HAM) basis, involves the construction of a feeder from Isarda to Khura Chainpura to Bandh Baretha Bharatpur. This includes all necessary components and their operations and maintenance (O&M) for 20 years.

The project has to be executed within a period of 27 months.

Shares of Ramky Infrastructure were currently trading 1.40% higher, at Rs 564.15 on the BSE.

Separately, the company informed that the DBL-RBL JV has received the letter of acceptance (LOA) for Rs 1503.63 crore project from Gurugram Metro Rail (GMRL).

The proje...